Looked at A1 Shell 1st through 4th floor corridors electrical RF towards TC
1) 1st floor corridor Sconce Lts, EM Lts, Exit Lts, Receptacles...electrically Ok
2) 2nd floor corridor Sconce Lts, EM Lts, Exit Lts, Receptacles...electrically Ok
3) 3rd floor corridor Sconce Lts, EM Lts, Exit Lts, Receptacles...electrically Ok
4) 4th floor corridor Sconce Lts, EM Lts, Exit Lts, Receptacles ...electrically Ok
5) Common areas not included
Defects to be corrected
1) 1st floor opening in ceiling exposed romex cabling and junction boxes (DBO)
2) 2nd floor opening in ceiling exposed MC Feeders (DBO)
3) 3rd floor near 3067 lighting outlet needs conductors identified as 277v and light installed
4) All levels re-purposed trash chute room needs sheetrock (DBO)
5) All levels various receptacles need arc shields in corridors
6) All levels the Unit Feeder Junction boxes in the ceiling need access covers & some boxes need to be re-labeled
7) All levels recheck Exit Lights some hanging due to damage by others, but operational
|
|