Last Update By |
Inspectors Notes |
Chargeable Failure |
Affects HFR |
POSSE system power user |
Install grounding electrode conductor to metal cold water pipe, main breaker too high/riser too low?, need access to main breaker, terminate all grounds and neutrals in sub-panel, install all sub-panel cover screws, sub-panel neutral bonded?, install breaker tie handle, protect cables as needed, terminate grounds correctly A/C disconnect, identify white wire A/C disconnect, install correct type wire to A/C unit from disconnect, need electrical contractor on site for information, job not ready, inspection incomplete. |
|
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|