Booth, Russell |
Looked at A2 units Electrical RF
Trinity / Huffine
1) 3rd floor: 3032, 34, 36, 38, 40, 42, 3059, 61, 63, 65, 67...Ok
2) 3rd floor: defects corrected during inspection, ground crimps changed to wire nuts, sheath in boxes, tape damaged cables
3) 2nd floor Defects Corrected: 2042 construction debris removed, Framing in unit 2032 bedroom...Ok
4) NOTE: A2 1st, 2nd & 3rd floor unit electrical RF's ...OK
|
|