| Fees |
|
 |
|
 |
| Permit Fee |
|
$59.70 |
|
Fire Damage Fee |
|
$0.00 |
 |
|
 |
|
|
|
|
Commercial Surcharge Fee |
|
$0.00 |
 |
|
 |
| Fax Fee |
|
$0.00 |
|
Fee Adjustment |
|
$0.00 |
 |
|
 |
| Triple Fee |
|
$0.00 |
|
Tech Surcharge |
|
$0.00 |
 |
|
 |
|
Total Fee |
|
$59.70 |
 |
 |
 |
 |
 |
 |
 |
 |
|
|
|
 |
|
 |
| Miscellaneous |
|
 |
|
 |
|
|
 |
|
 |
| Items Installed |
|
 |
|
 |
|
|
 |
|
 |
| Trade Details |
|
 |
|
 |
|
 |
|
Total Amps: |
|
|
|
Amps |
 |
|
 |
|
Number of Circuits: |
|
|
|
 |
|
 |
|
Circuits at 120 Volts: |
|
|
|
 |
|
 |
|
Circuits over 120 Volts: |
|
|
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
|
|
 |
|
 |
| Remarks |
|
 |
|
 |
|
Last Updated By |
Last Update Date |
Note |
|
Burgess, Melissa |
Mar 31, 2023 |
82' x 112' STEEL BUILDING SHALL BE ATTACHED AT THE ROOFLINE TO EXISTING HOME TO BE CONSIDERED ATTACHED. C/O SHALL NOT BE RELEASED WITHOUT ATTACHMENT. Subject to same setbacks as home. Proposed additional impervious area 9,184 SF + SF of covered walkway. Swim Buffer and Floodplain on property. Post construction zoning inspection required. Request zoning inspection through... |
|
Burgess, Melissa |
Mar 31, 2023 |
Proposed location of building is outside of the floodplain. |
|
Burgess, Melissa |
Mar 31, 2023 |
Proposed location outside of the floodplain. |
|
Burgess, Melissa |
Mar 31, 2023 |
Steel Building is being constructed in different location than what was approved on the permit. |
|
Burgess, Melissa |
Mar 31, 2023 |
This Storm Water hold has been added to the permit because a portion of the property is located within the special flood hazard area. Storm Water staff has been notified about this project and the project is in review. Storm Water will release the Storm Water permit hold or contact you with additional information requirements within 48 hrs. |
|
Burgess, Melissa |
Mar 31, 2023 |
This Storm Water hold has been added to the permit because a portion of the property is located within the special flood hazard area. Storm Water staff has been notified about this project and the project is in review. Storm Water will release the Storm Water permit hold or contact you with additional information requirements within 48 hrs. |
|
Ford, Laytoya |
Mar 30, 2023 |
Contractor Bond past due |
|
SIMMONS R E ELECTRIC |
Mar 29, 2023 |
Build saw service for well |
|
|
|
|
|
 |
 |
 |
 |
|
|
|
 |
|
 |
|
|
 |
|
 |
|
|
 |
|
 |
|
Permit Documents |
 |
|
 |
|
|
|
 |
|
 |
|
|
 |
|
 |
| This permit will expire if work either has not started within 6 months or is discontinued for a period of 12 months. No credit or refund will be given unless applied for within 120 days after a permit has expired. |
|
 |
 |
 |
 |
 |
 |
|
|
|
 |